La Central
Project Highlights
Project Highlights
Michael Bloomberg, towards the end of his tenure as Mayor of New York, awarded the rights to develop the Bronxchester site in the South Bronx to a team that included Bright Power. The new development, La Central, will consist of 5 buildings and 1.1 million square feet.
Construction began on Phase I (Building D) in the fall of 2017 and on Phase II (Buildings A and B) in the spring of 2018. La Central Phase III (Buildings C and E) is set to break ground in 2020.
In both Phase I and II, Bright Power is working with the team to incorporate efficiency and solar photovoltaic (PV) into the design. The five buildings, located between Bergen Avenue, East 149th Street, and Brook Avenue in the South Bronx, consisting of 500 new affordable apartments made available to low and moderate-income households.
Summer of 2021, the first two rental buildings officially opened. The mixed-use towers include 500 units of housing, a new YMCA, studio space for BronxNet, and a rooftop farm.
Construction began on Phase I (Building D) in the fall of 2017 and on Phase II (Buildings A and B) in the spring of 2018. La Central Phase III (Buildings C and E) is set to break ground in 2020.
In both Phase I and II, Bright Power is working with the team to incorporate efficiency and solar photovoltaic (PV) into the design. The five buildings, located between Bergen Avenue, East 149th Street, and Brook Avenue in the South Bronx, consisting of 500 new affordable apartments made available to low and moderate-income households.
Summer of 2021, the first two rental buildings officially opened. The mixed-use towers include 500 units of housing, a new YMCA, studio space for BronxNet, and a rooftop farm.
Market Type
Multifamily Market Rate & Affordable
Location
Bronx, NY
Developers
Hudson Companies
BRP Companies
Breaking Ground
Architects
FXCollaborative
MHG Architects PC
Future Green Studio
340 kW
Solar PV System
$588,000
Anticipated NYSERDA Incentives
EGC, LEED
Certifications
Work Completed
Work Completed
- $588,000 anticipated NYSERDA incentives
- BUILDINGS A, B, C, D & E: Commissioning
- BUILDINGS A, B, C, D & E: Total of ~340 kilowatt (kW) Solar PV design & installation
- BUILDINGS A, B, C & E: LEED Certification
- BUILDINGS A & B: 184 kW solar PV design & installation
- BUILDING D: Enterprise Green Communities (EGC) Certification